| |
NewswireTODAY - /newswire/ -
West Bromich, West Midlands, United Kingdom, 2010/06/23 - Tentec's bolt tensioning equipment for wind turbines incorporates an innovative wearplate that can be quickly and easily changes on site..
|
| |
|
| |
Your Banner Ad Here instead - Showing along with ALL Articles covering Energy / Hydrogen Announcements
Replace these Affiliate Programs at ANYTIME! Your banner here within the next hour. Learn How!
|
| |
The WTB multi-purpose wind turbine bolt tensioning tools from Tentec are all supplied with an innovative and unique interchangeable spacer at the base of the tool that gives this equipment the flexibility to be used on many different applications.
In contrast to many competitor systems on the market where the complete lower half of the tool needs to be replaced for particular applications or if wear and tear has caused damage, the Tentec system (tentec.net) has been designed and profile cut so that only a wearplate needs to be replaced. This not only makes the WTB range more versatile, but also lowers costs as the wearplate can be quickly and easily changed onsite and the cost makes it feasible for spare plates to be part of the engineer’s toolkit.
The Aero range comprises bolt tensioning tools suitable for a complete wind turbine bolting installation or maintenance programme on many different types and models of wind turbines. By listening to customer requirements these feature rich, powerful bolt tensioning tools are packed full of operator requested features including quick release swivel fittings, automatic piston reset and intuitive operation. The products are manufactured from aircraft quality high-strength tensile steel and are compact and lightweight for ease of handling.
“Having supplied many different industries with bolt tightening equipment, we know just what the engineer is looking for.” explains Paul Egginton, Engineering Director. “Here at Tentec, we have designed this new equipment to be technically excellent, fail-safe and commercially attractive. We aim to provide our customers with a fast and efficient service and understand that the 4-6 week turnaround time offered by many of our competitors is unacceptable and often detrimental to our customers’ business.”
This range is aimed at manufacturers of wind turbines, installation companies and subcontractors, as well as specialist service companies.
|
| |
 |
| |
Your Banner Ad Here instead - Showing along with ALL Articles covering Energy / Hydrogen Announcements
Replace these Affiliate Programs at ANYTIME! Your banner here within the next hour. Learn How!
|
| |
Agency / Source: In Press PR Ltd
|
| |
 |
| |
Availability: All Regions (Including Int'l)
|
| |
Traffic Booster: [/] Quick NewswireToday Visibility Checker
|
| |
Distribution / Indexing: [+]
|
| |
 |
| |
# # #
|
| |
|
| |
 |
| |
Your Banner Ad showing on ALL Energy / Hydrogen articles, CATCH Visitors via Your Competitors Announcements!
 Company website links NOT available to basic submissions |
|
It is OK to republish and/or LINK any newswire for any legitimate media purpose as long as you name NewswireToday and LINK as the source. |
| |
 |
| |
For more information, please visit:
Is this your article? Activate ALL web links by Upgrading to Press Release PREMIUM Plan Now!
| |
Contact: Eileen Holmes-Ievers - Inpress.co.uk
+44 (0) 1488 674200 sales[.]tentec.net
|