| |
NewswireTODAY - /newswire/ -
Ekibastuz, Pavlodar, Kazakhstan, 2019/06/18 - Alstom’s JV KEP[1] successfully tested its P80 point machine during a 6-months period on a newly installed turnout at Shiderty station, Ekibastuz, Pavlodar region - AlstomGroup.com. FR0010220475; ALO
|
| |
|
| |
Your Banner Ad Here instead - Showing along with ALL Articles covering Tools / Hardware Announcements
Replace these Affiliate Programs at ANYTIME! Your banner here within the next hour. Learn How!
|
| |
These tests were conducted in cooperation with KTZ (Kazakhstan Railways) and PMK (Prommashkomplekt) who developed new design of turnout. KEP has received official confirmation from KTZ Ekibastuz signalling and communication department, that during field tests from November 2018 to May 2019 no technical deviations were detected. P80 passed a severe winter operating in the temperatures lower than -40ºC and did 1200 switches.
«We are very pleased that these field tests proved our point machines’ flexibility and adaptability to Kazakhstan’s environment and maintenance conditions, as well as demonstrated uninterrupted operation and absolute compatibility with the upgraded turnouts manufactured by our partner in Kazakhstan”, said Guillaume Tritter, Alstom Managing Director for Kazakhstan.
Manufactured in KEP, Almaty Alstom’s P80 point machine is designed to operate with low maintenance level while providing the highest level of safety. P80 is suitable for mainlines, metro and freight lines. P80 point machine is certified for speeds up to 180 km/h and lifetime up to 20 years of commercial operation. Alstom has installed more than 50,000 point machines in over 30 countries worldwide.
KEP was formed in 2013 and was awarded a €90 million contract for the supply of 10,000 point machines to KTZ. Today KEP is owned 50/50 by Alstom (alstomgroup.com) and Special Oil Projects. With a total surface of 2,870m2, KEP employs 50 people and is working on supplying the point machines P80 to KTZ. Today 2,820 point machines have been in commercial operation and have proven to be reliable and suitable for Kazakhstan’s rail lines.
[1] KEP “JV “KazElektroPrivod” LLP (50% Alstom, 50% SOP Trade)
|
| |
 |
| |
Your Banner Ad Here instead - Showing along with ALL Articles covering Tools / Hardware Announcements
Replace these Affiliate Programs at ANYTIME! Your banner here within the next hour. Learn How!
|
| |
Agency / Source: ALSTOM Group
|
| |
 |
| |
Availability: All Regions (Including Int'l)
|
| |
Traffic Booster: [/] Quick NewswireToday Visibility Checker
|
| |
Distribution / Indexing: [+] / [Company listed above is a registered member of our network. Content made possible by PRZOOM / PRTODAY indexing services]
|
| |
 |
| |
# # #
|
| |
|
| |
 |
| |
Your Banner Ad showing on ALL Tools / Hardware articles, CATCH Visitors via Your Competitors Announcements!
 Company website links NOT available to basic submissions |
|
It is OK to republish and/or LINK any newswire for any legitimate media purpose as long as you name NewswireToday and LINK as the source. |
| |
 |
| |
For more information, please visit:
Is this your article? Activate ALL web links by Upgrading to Press Release PREMIUM Plan Now!
Tested P80 Point Machine
| Alstom Group |
Contact: Zaure Rakhmetova - AlstomGroup.com
+77 018 89 33 45 zaure.rakhmetova[.]alstomgroup.com
|