|
NewswireTODAY - /newswire/ -
Bad Vilbel, Germany, 2013/08/16 - The Department of Hydropower Implementation within the Ministry of Electric Power at Myanmar Republic commissioned the Consortium Lahmeyer International GmbH and Stucky SA with the consulting services for the new hydropower plant Upper Yeywa - Lahmeyer.de.
|
|
|
|
Your Banner Ad Here instead - Showing along with ALL Articles covering Energy / Hydrogen Announcements
Replace these Affiliate Programs at ANYTIME! Your banner here within the next hour. Learn How!
|
|
The Department of Hydropower Implementation within the Ministry of Electric Power at Myanmar Republic commissioned the Consortium Lahmeyer International GmbH and Stucky SA with the consulting services for the new hydropower plant Upper Yeywa. The contract was signed already in early June in the presence of his Excellency the Minister for Electric Power U Khin Maung Soe, his Excellency the Deputy Minister U Myint Zaw, and his Excellency the Deputy Minister U Aung Than Oo.
The Upper Yeywa Hydropower Project is located on the Myitnge River in the Kyaukme District of the Northern Shan State. It comprises a 90 m high concrete gravity dam with a crest length of 243 m, a gated spillway in the dam center with a discharge capacity of 8,900 m3/s, and two power intakes. Two headrace tunnels of 10 m diameter each lead to an open-air powerhouse located on the left bank of the river with an installed capacity of 280 MW.
The project is expected to start commercial operation in 2018. The consulting services of the Lahmeyer International - Stucky Consortium comprise the review of existing studies and design, the preparation of construction drawings, site supervision, and quality management.
Lahmeyer International was already the consultant for the Kinda Dam multipurpose project in Myanmar which was completed in 1983.
About Lahmeyer International
The name Lahmeyer is a trade name for experience and quality. Lahmeyer International (lahmeyer.de) was founded in Germany, but has been established on all continents for a long time as one of the leading engineering companies for multidisciplinary tasks. Governments and governmental agencies, utilities, industrial corporations, investors and international financing institutes all value us as a reliable partner for their projects.
|
|
|
|
Your Banner Ad Here instead - Showing along with ALL Articles covering Energy / Hydrogen Announcements
Replace these Affiliate Programs at ANYTIME! Your banner here within the next hour. Learn How!
|
|
Agency / Source: Lahmeyer International GmbH
|
|
|
|
Availability: All Regions (Including Int'l)
|
|
Traffic Booster: [/] Quick NewswireToday Visibility Checker
|
|
Distribution / Indexing: [+] / [Company listed above is a registered member of our network. Content made possible by PRZOOM / PRTODAY indexing services]
|
|
|
|
# # #
|
|
|
|
|
|
Your Banner Ad showing on ALL Energy / Hydrogen articles, CATCH Visitors via Your Competitors Announcements!
Company website links NOT available to basic submissions |
|
It is OK to republish and/or LINK any newswire for any legitimate media purpose as long as you name NewswireToday and LINK as the source. |
|
|
|
For more information, please visit:
Is this your article? Activate ALL web links by Upgrading to Press Release PREMIUM Plan Now!
Lahmeyer Hydropower Plant
| Yeywa Myanmar |
Contact: Press Office - Lahmeyer.de
+49(0) 6101 55-0 info[.]lahmeyer.de
|