PRTODAY / NewswireToday Free press release distribution service network

More news: Energy
Written by / Agency / Source: General Electric Company

Check Ads Availability|e-mail Article


Are you the owner of this article?, Turn it PREMIUM with your LOGO instead - and make it 3rd party Ads-Free! within the next hour!

GE Hitachi Nuclear Energy’s ESBWR Reactor Design Receives NRC’s Final Design Approval, Clearing the Way for Global Sales - GE Hitachi Nuclear Energy (GEH) announced its next-generation reactor model, the Economic Simplified Boiling Water Reactor (ESBWR), has received a positive final safety evaluation report (FSER) and final design approval (FDA)
GE Hitachi Nuclear Energy’s ESBWR Reactor Design Receives NRC’s Final Design Approval, Clearing the Way for Global Sales

 

NewswireToday - /newswire/ - Wilmington, NC, United States, 2011/03/09 - GE Hitachi Nuclear Energy (GEH) announced its next-generation reactor model, the Economic Simplified Boiling Water Reactor (ESBWR), has received a positive final safety evaluation report (FSER) and final design approval (FDA). NYSE: GE

   
 
Your Banner Ad Here instead - Showing along with ALL Articles covering Energy Announcements

Replace these Affiliate Programs at ANYTIME! Your banner here within the next hour. Learn How!


 

• Gives ESBWR ‘Country of Origin’ Safety Clearance for International Construction.
• ESBWR Remains on Track for Final NRC Design Certification in the Fall of 2011.

GE Hitachi Nuclear Energy (GEH) today announced its next-generation reactor model, the Economic Simplified Boiling Water Reactor (ESBWR), has received a positive final safety evaluation report (FSER) and final design approval (FDA) from the U.S. Nuclear Regulatory Commission (NRC). The FDA constitutes a finding by the NRC staff that the ESBWR design is safe and all technical issues have been resolved. It clears the way for the ESBWR to be built in countries around the world that recognize the FDA of a reactor design as acceptance by the “country of origin.”

The NRC’s positive FSER clears the path for GEH’s ESBWR to receive the agency’s final design certification in the fall of 2011, providing regulatory finality of the ESBWR design in the United States. Michigan utility DTE Energy has selected the ESBWR design for a potential reactor project next to its existing Fermi 2 plant south of Detroit. The NRC is currently reviewing DTE Energy’s license application for the Fermi 3 project, which serves as the “reference combined license application” for the ESBWR design.

The ESBWR is GEH’s newest reactor design that offers the world’s most advanced passive safety systems, simplified construction and operation, as well as the lowest core damage frequency on the market today. A single ESBWR project would create several thousand construction jobs and several hundred permanent engineering positions while also creating opportunities for local equipment and service vendors.

“The ESBWR is one final step away from becoming a reality,” said Caroline Reda, president and CEO of GEH. “The FSER and FDA mark a crucial step forward for the ESBWR’s global commercial prospects. We appreciate the diligence of the NRC during the review process, which enables the ESBWR to remain on track to receive the NRC’s final design certification by this fall.”

One of those key commercial prospects is India, which as part of its massive nuclear energy expansion program has identified a site that would feature multiple GEH ESBWR reactors.

In addition to the NRC’s FSER and FDA, other recent ESBWR developments announced by GEH include:

• With Poland proposing to build two nuclear power plants, GEH has been expanding its network of local equipment suppliers and engineering firms to prepare for potential reactor projects. In February 2011, GEH signed an MOU with the Institute of Atomic Energy in Poland (POLATOM), a research institute that advises the Polish government on nuclear energy issues. In January 2011, in Gdansk, GEH signed preliminary agreements with Poland’s Stocznia Gdansk, a major shipyard, and RAFAKO S.A., Europe’s leading boiler equipment manufacturer, to pursue opportunities to build nuclear reactor components for GEH.

• Also in February 2011, GEH and Lockheed Martin Corporation signed an agreement for Lockheed Martin Corporation to design and manufacture the main reactor control room systems for the ESBWR. The ESBWR’s innovative digital instrumentation and control design and development process are rigorously compliant to nuclear regulations and globally recognized standards.

About GE Hitachi Nuclear Energy
Based in Wilmington, N.C., GE Hitachi Nuclear Energy (GEH) is a world-leading provider of advanced reactors and nuclear services. Established in June 2007, GEH is a global nuclear alliance created by GE and Hitachi to serve the global nuclear industry. The nuclear alliance executes a single, strategic vision to create a broader portfolio of solutions, expanding its capabilities for new reactor and service opportunities. The alliance offers customers around the world the technological leadership required to effectively enhance reactor performance, power output and safety.

PRESS Contacts
Tom Murnane, Masto Public Relations
P: +1 518 786 6488 / E: tom.murnane[.]mastopr.com.

GE news, Masto Public Relations / E: information[.]mastopr.com.

 
 
Your Banner Ad Here instead - Showing along with ALL Articles covering Energy Announcements

Replace these Affiliate Programs at ANYTIME! Your banner here within the next hour. Learn How!


 

Written by / Agency / Source: General Electric Company

 
 

Availability: All Regions (Including Int'l)

 

Traffic Booster: [/] Quick Newswire Today Visibility Checker

 

Distribution / Indexing: [+] / [Company listed above is a registered member of our network. Content made possible by PRZOOM / PRTODAY indexing services]

 
 
# # #
 
 
  Your Banner Ad showing on ALL
Energy articles,
CATCH Visitors via Your Competitors Announcements!


GE Hitachi Nuclear Energy’s ESBWR Reactor Design Receives NRC’s Final Design Approval, Clearing the Way for Global Sales

Company website links NOT available to basic submissions
It is OK to republish and/or LINK any newswire for any legitimate media purpose as long as you name Newswire Today and LINK as the source.
 
  Is this your article?
Activate ALL web links and social stream by Upgrading to Press Release PREMIUM Plan Now!

GE News Center |
Publisher Contact: Michael Tetuan - GE Hitachi Nuclear Energy 
910-819-7055 michael.tetuan[.]ge.com
 
Newswire Today - PRZOOM / PRTODAY disclaims any content contained in this article. If you need/wish to contact the company who published the current release, you will need to contact them - NOT us. Issuers of articles are solely responsible for the accuracy of their content. Our complete disclaimer appears here.
IMPORTANT INFORMATION: Issuance, publication or distribution of this press release in certain jurisdictions could be subject to restrictions. The recipient of this press release is responsible for using this press release and the information herein in accordance with the applicable rules and regulations in the particular jurisdiction. This press release does not constitute an offer or an offering to acquire or subscribe for any General Electric Company securities in any jurisdiction including any other companies listed or named in this release.

Energy via RSSAdd NewswireToday - PRZOOM Headline News to FeedBurner
Find who RetweetFollow @NewswireTODAY



Are you the owner of this article?, Turn it PREMIUM with your LOGO instead - and make it 3rd party Ads-Free! within the next hour!


Read Latest Articles From General Electric Company / Company Profile


Read Energy Most Recent Related Newswires:

Enel Group Confirmed in Euronext Vigeo Eiris Sustainability Indices for Fifth Straight Year
Invenergy Selects GE Renewable Energy to Provide Cyber Security for Entire Fleet
GNF3 Fuel Product Completes U.S. NRC Approved Process for New Fuel Product Introductions
Surging Demand from Data Centres Energises European Diesel Genset Market Finds Frost & Sullivan
Mexican Ministry of Energy Awards Three Geothermal Exploration Permits - A Key Step Forward for ENGIE and Reykjavik Geothermal
Forestalia Selects GE Renewable Energy to Provide 1,200 MW of Wind Power in the Largest European Auction to Date
Enel Launches E-Solutions - A New Global Business Line
Enel Buys A Stand-alone Battery Energy Storage Project in UK
GE Supports Power Grids of the Future with Europe’s First MVDC Link
ENGIE Launches Home Energy Business in the UK
Akenerji Selects GE’s Predix-based Operations Optimization Software to Improve Gas Thermal Plant Efficiencies and Performance
Enel Starts Construction of New 298 MW Wind Project in The United States
OPEC and Non-OPEC Nations Will Reduce Oil & Gas Production to Restore Supply-Demand Parity Finds Frost & Sullivan
ENGIE and AES Agree to Expand their LNG Marketing Partnership to Central America
GE to Supply Power Generation Technology for Ghana’s 400 MW Bridge Power Project

Boost Your Social Network
& Crowdfunding Campaigns


LIFETIME SOCIAL MEDIA WALL
NewswireToday Celebrates 10 Years in Business


PREMIUM Members


Visit MagLar, Inc.

Visit  Deb Sheppard - Medium Psychic Author Speaker





 
  ©2017 Newswire Today — Limelon Advertising, Co.
Home | About | Advertise/Pricing | Contact | Investors | Privacy/TOS | Sitemap | FRANCAIS
newswire, PR free press releases distribution service magazines engine news alert newsroom press room breaking news public relations articles company news alerts newswiredistribution ezine bizentrepreneur biznewstoday digital business report market search pr firms agencies reports distri-bution today investor relation successful internet entrepreneurs newswire distribution prtoday.com freenewswiredistribution asianewstoday bizwiretoday USA pr UK today - NOT affiliated with PRNewswire as we declined their partnership offer in 2013
 
PRTODAY & NewswireTODAY are NOT affiliated with USA TODAY (usatoday.com)