PRTODAY / NewswireToday Free press release distribution service network

More news: Energy
Written by / Agency / Source: ALSTOM

Check Ads Availability|e-mail Article


Are you the owner of this article?, Turn it PREMIUM with your LOGO instead - and make it 3rd party Ads-Free! within the next hour!

Alstom Brings Unit 6 of Šoštanj Power Plant to Full Load - Alstom successfully operated Unit 6 of Šoštanj power plant in Slovenia at its full capacity of 600 MW for the first time - Alstom.com
Alstom Brings Unit 6 of Šoštanj Power Plant to Full Load

 

NewswireToday - /newswire/ - Levallois-Perret, Hauts-de-Seine, France, 2014/11/10 - Alstom successfully operated Unit 6 of Šoštanj power plant in Slovenia at its full capacity of 600 MW for the first time - Alstom.com. FR0010220475; ALO

   
 
Your Banner Ad Here instead - Showing along with ALL Articles covering Energy Announcements

Replace these Affiliate Programs at ANYTIME! Your banner here within the next hour. Learn How!


 

This major achievement in terms of reliability comes only one month after the successful completion of the synchronization of unit 6 to the Slovenian grid and the production of the first MWs, and 3 months after the first fire of the boiler. Once in operation, the new unit will generate approximately one third of Slovenia’s power production, thus allowing the country to ensure its independence on energy imports.

“We are all extremely proud of this major achievement”, says Jérôme Poupon, Šoštanj Project Director. “Bringing Unit 6 to 600 MW is the result of 5 years of hard work in close collaboration with our Customer TES. Compared to the existing units, unit 6 will increase the net efficiency from 30% to 43%. At the same time, CO2 emissions will be reduced by 20%; SOx and NOx emissions by approximately 50%”.

Alstom signed a contract with TES in 2008, under which Alstom the Group will supply the complete power island of the new Šoštanj Unit 6 (comprising the steam turbine, generator set, water-steam cycle, the boiler and the ALSPA distributed control system) for Unit 6 which will be added to the existing Šoštanj power plant units.

Alstom (alstom.com) has previously installed two 114 MW gas turbines in Slovenia (228 MW in total) as well as several steam turbines both for electricity production and district heating, and is executing service contracts in the country. Alstom has already carried out work on the Šoštanj power plant, modernising the boiler for unit 5, in order to reduce emissions and meet environmental requirements.

Press Contacts
Claire Biau - Alstom Group
T:+33(0)1 41 49 39 95 - E: claire.biau[.]alstom.com.

Christopher English (Thermal Power)
T: +33(0)1 41 49 26 85 - E: christopher.english[.]power.alstom.com.

Daniela Pradella (Alstom South Eastern Europe)
T: +39 02 24 348 4493 - E: daniela.pradella[.]alstom.com.

 
 
Your Banner Ad Here instead - Showing along with ALL Articles covering Energy Announcements

Replace these Affiliate Programs at ANYTIME! Your banner here within the next hour. Learn How!


 

Written by / Agency / Source: ALSTOM

 
 

Availability: All Regions (Including Int'l)

 

Traffic Booster: [/] Quick Newswire Today Visibility Checker

 

Distribution / Indexing: [+] / [Company listed above is a registered member of our network. Content made possible by PRZOOM / PRTODAY indexing services]

 
 
# # #
 
 
  Your Banner Ad showing on ALL
Energy articles,
CATCH Visitors via Your Competitors Announcements!


Alstom Brings Unit 6 of Šoštanj Power Plant to Full Load

Company website links NOT available to basic submissions
It is OK to republish and/or LINK any newswire for any legitimate media purpose as long as you name Newswire Today and LINK as the source.
 
  Is this your article?
Activate ALL web links and social stream by Upgrading to Press Release PREMIUM Plan Now!

Šoštanj Power Plant | Alstom
Publisher Contact: Virginie Hourdin - Alstom.com 
+33 1 41 49 21 36 virginie.hourdin-bremond[.]chq.alstom.com
 
Newswire Today - PRZOOM / PRTODAY disclaims any content contained in this article. If you need/wish to contact the company who published the current release, you will need to contact them - NOT us. Issuers of articles are solely responsible for the accuracy of their content. Our complete disclaimer appears here.
IMPORTANT INFORMATION: Issuance, publication or distribution of this press release in certain jurisdictions could be subject to restrictions. The recipient of this press release is responsible for using this press release and the information herein in accordance with the applicable rules and regulations in the particular jurisdiction. This press release does not constitute an offer or an offering to acquire or subscribe for any ALSTOM securities in any jurisdiction including any other companies listed or named in this release.

Energy via RSSAdd NewswireToday - PRZOOM Headline News to FeedBurner
Find who RetweetFollow @NewswireTODAY



Are you the owner of this article?, Turn it PREMIUM with your LOGO instead - and make it 3rd party Ads-Free! within the next hour!


Read Latest Articles From ALSTOM / Company Profile


Read Energy Most Recent Related Newswires:

GE Completes Acquisition of LM Wind Power
Enel Starts Construction of 300 MW Red Dirt Wind Farm in United States
ET Solar and DSM Announce Strategic Partnership to Accelerate Market Penetration of PV Modules Featuring Unique Sustainable and Durable Backsheets
El Lago Named 'Green Power Community' in Texas by U.S. EPA
GE and Southern California Edison Debut World’s First Battery-Gas Turbine Hybrid
GE Successfully Installed the First Unit of 1,500-Volt Solar Inverter in Japan
ENGIE Wins A 338 MWp Solar Project in India
GE & MGH Mark Commercial Operations of 9F Gas Turbines At Baghdad Power Plant
ENGIE and Axium Secure 50-year Comprehensive Energy Management Contract with The Ohio State University in the US
ENGIE Axima Chosen by the Shipyard MV Werften within the Scope Limit of the Building of 2 XXL Cruise Ships
SPR Energy Puts Trust in GE to Operate Malaysian Power Plant for the Next 18 Years
ENGIE Acquires 100% of La Compagnie Du Vent
Enel Signs 25-Year PPA with Zambian National Utility Zesco
ENGIE to Transfer its 40% Stake in NuGen Project to Toshiba
Enel Begins Operation in USA of its Largest Wind Farm

Boost Your Social Network
& Crowdfunding Campaigns


LIFETIME SOCIAL MEDIA WALL
NewswireToday Celebrates 10 Years in Business


PREMIUM Members


Visit  MagLar, Inc.

Visit  BizJobs.com





 
  ©2017 Newswire Today — Limelon Advertising, Co.
Home | About | Advertise/Pricing | Contact | Investors | Privacy/TOS | Sitemap | FRANCAIS
newswire, PR free press releases distribution service magazines engine news alert newsroom press room breaking news public relations articles company news alerts newswiredistribution ezine bizentrepreneur biznewstoday digital business report market search pr firms agencies reports distri-bution today investor relation successful internet entrepreneurs newswire distribution prtoday.com freenewswiredistribution asianewstoday bizwiretoday USA pr UK today - NOT affiliated with PRNewswire as we declined their partnership offer in 2013
 
PRTODAY & NewswireTODAY are NOT affiliated with USA TODAY (usatoday.com)